
| Year: 1997
Client: SLD - Soc. Lusitana de Destilação - Distillery Industry Power: 3,9MW Main equipment: Motor Diesel MAN 9L 32/40 Overall scope of the project MAN with WinPower consultancy: • Base and detail engineering
|

| Year: 1997
Client: SLD - Soc. Lusitana de Destilação - Distillery Industry Power: 3,9MW Main equipment: Motor Diesel MAN 9L 32/40 Overall scope of the project MAN with WinPower consultancy: • Base and detail engineering
|